We are a leading Manufacturer of technonicol underlay next self underlayment from Mumbai, India.
TECHNONICOL Underlay Next Self Underlayment
Ask For Price
Product Price :Get Latest Price Product Brochure
Product Details:
Minimum Order Quantity
100 Roll
Brand
Technonicol
Dimensions
25+-2% meter X 1+-3% meter
Packaging Type
Rolls
Is It Waterproof
Waterproof
Type of material
S-Modified Bitumen Self-Adhesive Non-reinforced Underlay Membrane For Pitched Roofs
Mass per unit area, kg/sqm
1.0+-0.1
Flexibility at low temperature
Not More Than -15
Flow resistance at elevated temperature
Not More Than +90
Tensile properties: elongation L / T, %
20+-10 / 20+-10
Tensile properties: maximum tensile force L / T, N/50mm
600+-200 / 600+-200
Tear resistance L / T, N
500+-100 / 500+-100
Peel resistance of joints: overlap to film, N/50 mm
40+-15
Type of carrier
Non Reinforced
Protection of the top side
Multilayer Polypropylene Fabric
Protection of the bottom side
Anti Adhesion Film
Underlay next self is a non-reinforced self-adhesive polymer- bitumen underlay membrane. The top side of the material is covered with a strong multilayer polypropylene fabric that prevents applicators from slipping from the pitched roof. Special marking lines on the fabric make the following installation ofThe roofing shingles easier. A high- performance self-adhesive bitumen compound on the bottom side provides maximum reliability and eliminates the need for the application of adhesive mastic on overlaps. Installation of the membrane takes minimum time and does not require any additional equipment and skills
Request Callback
Additional Information:
Delivery Time: 72 hours
Packaging Details: Rolls of the material should be stored indoors in a dry place in their original packaging and taken to the construction site ready to use. Rolls should be stored upright on pallets in a 1-row height. Storage of rolls in a horizontal position is prohibited. Falls or other mechanical impacts should be avoided during transportation and storage. Shelf life if all storage requirements are met:
12 months from the date of production.